Sweden – grid protection settings according to EIFS 2018:2
In Sweden, battery energy systems up to 1.5 MW are classified as Type A installations.
Type A systems - protection settings
For Type A systems, install a grid monitoring relay and configure it with the protection settings shown below:
Relay protection setting | Time | Level |
---|---|---|
Overvoltage - step 2 |
60 s |
1.1 x Un |
Overvoltage - step 1 |
0.2 s |
1.15 x Un |
Undervoltage |
0.2 s |
0.85 x Un |
Overfrequency |
0.5 s |
51.5 Hz |
Underfrequency |
0.5 s |
47.5 Hz |
0.5 s |
2.5 Hz/s |
Automatic reconnection settings for type A
Configure the relay to allow automatic reconnection based on frequency only when the mains frequency has remained continuously within the range of 47.5 Hz to 50.1 Hz for a minimum of 180 seconds.
In addition, configure voltage-based automatic reconnection so that it is only permitted when the grid voltage has remained within the range of 207 V to 253 V for at least 180 seconds.
Note:
- For legal and regulatory reference, see: Energimarknadsinspektionens föreskrifter om fastställande av generellt tillämpliga krav för nätanslutning av generatorer (EIFS 2018:2).
- For detailed ABB relay-specific configuration, see the section Sweden type A later in this manual.
- For settings related to Ziehl devices, consult the corresponding device manual.